Calculating demand factors for 208V single phase ranges and converting to 208V three phase service, 220.55: says "Where two or more single-phase ranges are supplied by a 3-phase, 4-wire feeder or service, the total load shall be calculated on the basis of twice the maximum number connected between any two phases.
Does this formula also apply to all single phase loads (AC, heating, etc.) when doing a service calculation on a 3 phase service??
Does this formula also apply to all single phase loads (AC, heating, etc.) when doing a service calculation on a 3 phase service??