Magic Gorge
Member
- Location
- Lexington, KY
Doing a coordination study for a parallel generator system. There are two 800kW generators with 1200A breakers, and 1200A main breakers at the generator switchboard. When I look at coordination, should those 1200A breakers be 2400A in reference to the breakers on the load side of the switchboard? Or should it be looked at radially? Looking for opinions on how other engineers might view this, since the load sizes suggest both gens are always online. No other scenarios have been outlined for generator operation.