Hi, I am wiring 2- 3 phase 480 volt pieces of equipment. I am going to install a new sub panel to feed both pieces of equipment. The one piece says all field wiring stranded copper conductors only. The feeders I run to the sub panel can they be Aluminum and then run copper between the sub panel and the piece of equipment. Is this good practice.