Recharge 816
Member
- Location
- Gulf Breeze ,Florida
- Occupation
- Electrical Contractor
Need some help with the correct install of CT's for a solar hook up . Solar system is controlled by EnPlase IQ Combiner 3 ES . Meter can has parallel 3/0 cu that run to two 200 amp main breakers .Local Solar Company only installed ct on load side of one 200 amp breaker . Thank you