yesterlectric
Senior Member
- Location
- PA
- Occupation
- Electrician
I install what's specified on my jobs and sometimes it's what comes with the equipment. However, when dealing with single ratio CT's on a 3 phase system, are there ever shorting blocks that would have the common permanently shorted to the bridge such that only 1 temporary shorting screw per phase would need to be installed to bypass CT's?