We have a panel that feeds 5 different machines and of those five the utility company would like to monitor 3 of those machines for 3 weeks using CT's. Our in house engineer trying to be conservation with cost says that we only need one 3 phase monitor for the line side coming into the panel. His belief is that if we run the load side wires of the equipment we don't want to monitor up through the CT's that it will null that particular machine draw via the CT. He supports this theory with the right hand rule, which makes sense but I am not convinced. Has anyone seen this done or even think this is plausible. Thanks.