Starting a new construction house and on Saturday my guys set the C-H 400 amp meter/combo with 8/16 space buss built in. I go on Monday to install the service wire and notice something wrong in the load side of the cabinet. The bar with the neutral lugs and the ground bar are not there. Never installed from the factory. Call supplier, send photos C-H rep. wants a date code that will tell them where, when and who inspected the panel and let it get by. Today supplier said parts have shipped.
Here is my bone of contention with the ordeal. There I am with my customers, looking on at their soon to be $300,000.00 home and I have to tell them they left out some parts. Now I could have taken the panel down and returned it but I would still have to wait to get a new one in. But doing that it would cost me more money taking it down, returning it, picking up the new one and installing it. I told my supplier that I felt that Cuttler- Hammer owed me some type of consideration for now having to correct their mistakes. Don't know if it will happen but it made me feel better to unload on them. What would you have done?
Here is my bone of contention with the ordeal. There I am with my customers, looking on at their soon to be $300,000.00 home and I have to tell them they left out some parts. Now I could have taken the panel down and returned it but I would still have to wait to get a new one in. But doing that it would cost me more money taking it down, returning it, picking up the new one and installing it. I told my supplier that I felt that Cuttler- Hammer owed me some type of consideration for now having to correct their mistakes. Don't know if it will happen but it made me feel better to unload on them. What would you have done?