Anyone here know the average hourly billable rate for a journeyman in Dallas being subbed out?
It would be a non complex but detailed drawing driven pipe and wire job in an existing open air 4 story residential structure. All 3/4" and 1" pipe surface mounted off 6-8' ladders. Total hours 2500-3500.
It would be a non complex but detailed drawing driven pipe and wire job in an existing open air 4 story residential structure. All 3/4" and 1" pipe surface mounted off 6-8' ladders. Total hours 2500-3500.