a vendor is selling seal-tite whips to a customer maintaining that the whip has to be listed. my response was, you can assemble your own whip as long as the parts are listed. We're talking connectors, seal-tite, wire, etc. Is my statement correct? What is the best wat to label the PDU? Raised floor locations change, equipment changes,
in a critical environment wrong information at the PDU can cause problems. Is there a standard or
an accepted practice.