mshields
Senior Member
- Location
- Boston, MA
Doing a 4 story apt building with a daycare on the ground floor. This happens to be in Mass. I plan to distribute to the units via a metering switchboard in the basement and via SE cable. I'm wondering two things:
1. Can I distribute to the Day care via SE cable?
2. Does the fact that I have a day care in the building have any impact on how I feed the rest of the building?
thanks,
Mike
1. Can I distribute to the Day care via SE cable?
2. Does the fact that I have a day care in the building have any impact on how I feed the rest of the building?
thanks,
Mike