pesk
New member
- Location
- clearfield
Quick question, we are installing a new hoist for a new mine. The engineers are from Canada, they have speced out a 525VDC 3000A open air high speed breaker without an enclosure. The terminations are open and the arc shute is about 24" above the ground, I do not have a NFPA book onsite but I feel this piece of equipment needs to be in a rated enclosure. The engineers claim that it meets requirements, granted its behind a fence with about 6 feet clearance. Has anyone ran into this before?