In the exception to 110-26(f)(1)(a), I am confused as to what this means. Could someone please give me some examples of an installation that would comply with the exception. I am inspecting a project with an interstitial level full of piping and ducts and a couple panelboards. The contractor would like to take advantage of the exception, but we don't know how to apply it.
I would be grateful for any insight
Thanks
I would be grateful for any insight
Thanks