Is there code that says not run conduit in dedicated equipment space of panel boards/switchboards/mcc’s if it’s not connected to it?
I was in a nec training class and I relied this being brought up, looked at 110.26e but I might be look at the wrong reference.
I was in a nec training class and I relied this being brought up, looked at 110.26e but I might be look at the wrong reference.