Hi guys,
I'll be wiring 25 induction cooktops in a restaurant dinning area. This is a hot-pot style restaurant where people do the cooking themselves at the table. These cooktops are rated 1800w 120v. Can I apply the demand factor for the feeder and sub-panel from 220.56 in this application? If so, how are the load calculation for perform for all phases and the neutral?
I'll be wiring 25 induction cooktops in a restaurant dinning area. This is a hot-pot style restaurant where people do the cooking themselves at the table. These cooktops are rated 1800w 120v. Can I apply the demand factor for the feeder and sub-panel from 220.56 in this application? If so, how are the load calculation for perform for all phases and the neutral?