I need to supply 120v 20 circuit for a gate motor. 20' from where power exits bldg.
GC to saw cut side walk and drive. We trench.
Under drive is supposed to be 2' by code .
Can using RMC change that depth?
GC to saw cut side walk and drive. We trench.
Under drive is supposed to be 2' by code .
Can using RMC change that depth?