mstrlucky74
Senior Member
- Location
- NJ
My ups vendor and shop engineer seem to disagree. Have a 4-20a ckts in a 3/4" conduit with each ckt having 1h&1n. We all agree there are 8 ccc but ups engineer is using 75 degree column to derate which is why he shows #10 but my shop engineer is using 90 degree column which give you 21a and thus he's showing #12's. Which column should be used to derate in this situation ? Thanks