I have a customer that currently is in a building with a 1000 Amp CT cabinet that is fed from a TAP box with (4) 500MCM type THHN-2, through a 4" conduit. His new equipment has a total calculated load of 606 Amp, 208V 3 Phase. Article 220 states that I can use the highest KW usage from his utility bills over the last 12 months X 125% plus the new load. Can I derate the new load or do I have use the total. If I can derate, by what factor? NEC is geared more towards residential dwelling units or farm equipment. I don't have a clear referance for industrial equipment.