we have a 400A 3PH 4W service entering a building...from the CT we are feeding (2) 200A MCB panels via a trough...
if we run a set of 3/0 from the CT to each panel (distance is about 6' to 1st panel, and 8' to 2nd) in the trough.....do we need to derate?
i haven't done any calculations, just thinking out loud...
edit to add: the trough is 8"x8"
if we run a set of 3/0 from the CT to each panel (distance is about 6' to 1st panel, and 8' to 2nd) in the trough.....do we need to derate?
i haven't done any calculations, just thinking out loud...
edit to add: the trough is 8"x8"
Last edited: