Hi senior,
I have been involved in designing many residential building, commercial building and industrial buildin. I am struggling here to design a process plant where the estimated load is around 15 Megawatt. so the local utility people advising us to design MV switching station also.
I seeks advise from the senior who experienced in designed MV switching station...
I have been involved in designing many residential building, commercial building and industrial buildin. I am struggling here to design a process plant where the estimated load is around 15 Megawatt. so the local utility people advising us to design MV switching station also.