Flanative
Member
- Location
- Labelle , Fl
- Occupation
- Electrical Contractor
I have a customer asking us to bid an elevated dwelling. Service is already done and built by another contractor. Basically want us to do the rough and trim. Pretty straightforward with the exception that the main panel is Detached and on a concrete pedestal 3’ away from the footprint of the building and the dwelling is on the second story. Customer doesn’t want a panel in the home due to EMF sensitivity. Anyone ever had a situation like this. I’m struggling with code compliance on this. Any insight?