Hello,
Looking for some thoughts on the following situation.
Main building has its own Ground Electrode System. A distribution panel sends a feeder to a remote building where it terminates into a local primary disconnect of a step down transformer. The secondary of the transformer terminates into a local lighting panel. This being a remote building it will have its own GES. The neutral will be connected to the ground terminal through its System bonding jumper. The ground terminal will be bonded to a ground electrode through a GEC.
The question is, does the GEC go to the remote buildings GES or the originating location GES?
Looking for some thoughts on the following situation.
Main building has its own Ground Electrode System. A distribution panel sends a feeder to a remote building where it terminates into a local primary disconnect of a step down transformer. The secondary of the transformer terminates into a local lighting panel. This being a remote building it will have its own GES. The neutral will be connected to the ground terminal through its System bonding jumper. The ground terminal will be bonded to a ground electrode through a GEC.
The question is, does the GEC go to the remote buildings GES or the originating location GES?