Is there a quick format to determine if an existing load center, panelboard, MCC, or transformer has the capacity to add new loads? We have one-line diagrams available, but we do not have load metering for each panel or bus duct. In our industrial environment we typically rate the loads as 'continuous'.
In short, how do we know if we can add another panel or pump to an existing main panel?