I amcurrently designing the electrical system for a gantry crane we are refurbishing. There is a terminal box at each end of the festoon where 600V rated power & control conductors are transfered to flat cable for the festoon. They are routed through slotted panduit in the enclosures. I also have (1) 3-pair twisted, shielded cable (encoder) and (1) one-pair twisted shielded cable (load cell). These do not have any intermediate terminations between device and control cabinet. Can I route these cables through the same enclosures in solid wall panduit and satisfy the NEC?