Hello. Just wondering about the difficulty of pulling through HDPE conduit.
I've got a roughly 500' directionally bored 2" HDPE conduit to pull (3) #1 Cu through. Is this something that can be reasonably accomplished in one pull or should I break the pull up into two segments?
Thanks for your time and thoughts,
Alan
I've got a roughly 500' directionally bored 2" HDPE conduit to pull (3) #1 Cu through. Is this something that can be reasonably accomplished in one pull or should I break the pull up into two segments?
Thanks for your time and thoughts,
Alan