When direct burial cable is suitable to haz locations, how is transition from an underground hazardous loacation made to an aboveground non-haz ?
Is it permissible to sleeve the last, say 2' on u/g cable in RMC and provide a xp seal off inside the non haz area ? Would a splice box be required to seal the u/g end ?
Any help / thoughts are appreciated.
Is it permissible to sleeve the last, say 2' on u/g cable in RMC and provide a xp seal off inside the non haz area ? Would a splice box be required to seal the u/g end ?
Any help / thoughts are appreciated.