storeytime
Member
- Location
- Texas
I'm having trouble finding this one in the NEC. Lighting for a helicopter pad is fed with 12/2 UF cable from an outdoor 3R box. The box is fed from the building with PVC underground. I have always assumed direct burial romex is not legal on a commercial sight, but this is on the grounds, not in the building. I have already told the company I would replace the UF with conduit and wire. That's the only way I would do this job, but does the code require that?