Im looking at some blue prints that shows an outdoor 208V - 3 phase - 200A disco. being fed from the landlords electrical room. Then they go out of the top of the disco. into a 3Ph - 200A meter base, and then the meter base feeds a 3Ph - 200A indoor panel. My question is wouldnt it be easier to have the meter base ahead of the disco.? Obviously with my question I dont do as much commercial work as I would like to. Is there a reason why the engineer would want the disco. ahead of the meter base? Thanks.