blvengineers
Member
Guys I think I have misunderstood the code as it relates to disconnecting means. I have a 2000A 480Y/277, 3 phase 4 wire distribution system. I have individual distribution cabinets placed throughout the facility. Is it legal to make the downstream distribution panels main lug only? Does the code not require disconnecting means if not within 25 feet line of site. I really need to get this answered before my bid date. Also, this may cause a coordination problem with the source breaker in the MSDB and the main breaker in the HDP panel.