Nomad776
Member
- Location
- Houston, TX
I’m working on a job where the drawings show the electric heat and AC condensers are protected by only the breaker and a non fused disconnects. Is this permissible? Don’t they have to have properly sized fusible disconnects too? Can anyone clarify? This is a restaurant BTW.