I was informed that I needed a disconnect after and at the service meter and before the supply panel. Is this mandatory under NEC rules? I was told by the electric company that a trailer house breaker panel would be sufficient and have to be installed on the outside next to the meter base in order to serve as the disconnect for my load center box. That is my question as to if it is necessary or not under the rules.