i have a serious issue with my client in afghanistan . i am not an nec expert firstly..... i have used a sched 40 plumbing pipe under the slab of the building for electrical cables.... but my cable is tech90...... is it really required to have a ul listed conduit under the slab to pull a tech 90 cable which is more than what my client requires..... as i have already done the pipes in the slab is there any justification to defend...........or how i can solve this issue
i have a serious issue with my client in afghanistan . i am not an nec expert firstly..... i have used a sched 40 plumbing pipe under the slab of the building for electrical cables.... but my cable is tech90...... is it really required to have a ul listed conduit under the slab to pull a tech 90 cable which is more than what my client requires..... as i have already done the pipes in the slab is there any justification to defend...........or how i can solve this issue