I can not locate any reference in the NEC to require a housekeeping pad for MCC equipment. The actual MCC room is all ready at a higher elevation than the processing room. Thanks for any comments.
Unless the requirement is part of the listing or in the instructions for the equipment I would agree with Don. Having said that, we install them usually when they're specified by the designer or the client.