Here we go again. We need an interpretation of the NEC. We usually get crucified on this forum, but I am reluctantly posting this question, because my guys have looked and couldn't find it. We do not do electric work under the NEC, but we get stuck with trying to keep people safe. We are the providing utility.
We have a person that has buried 2 runs of 4/0 use into a building. One run serves a 200 amp load center, the other one serves a 200 amp Disconnect(inside). For some reason they went out of the Disconnect back outside, along the building in conduit to the other end of the building back into another 200 amp load center.
For some reason we were under the impression that they would need outside disconnects in order to do this.
What we need to know is if this is ok or not.
We have a person that has buried 2 runs of 4/0 use into a building. One run serves a 200 amp load center, the other one serves a 200 amp Disconnect(inside). For some reason they went out of the Disconnect back outside, along the building in conduit to the other end of the building back into another 200 amp load center.
For some reason we were under the impression that they would need outside disconnects in order to do this.
What we need to know is if this is ok or not.