I just ran a 4 wire feed in PVC to a 100 amp subpanel in a separate building, no metallic paths attatching the two buildings. I ran two hots, a neutral, and a ground wire from a 200amp main panel in the first structure. My question is on the 100 amp subpanel, it came with a green screw (not installed) that the instructions said would need to be installed if it was necessary to bond the panel to the neutral. I know I didnt need this since I ran a 4 wire system...but my question is I thought if I ran a 3 wire system I would have to tie the ground buss to the neutral buss..the panel has what looks like it already has a tie bar from the ground buss to the neutral buss at the top? Should this be here? I looked at the 200 amp main and it also has a tie bar from the neutral buss to the ground buss. Is this correct? I thought there should be no mechanical connection between the ground or neutral buss but maybe I am missing something?