Hello All, I am looking for 1200A service for an existing bldg with two tenants. owner wants to them to pay the bill separately. I am thinking to design 1200A , aluminium (not copper bus which is expensive) bus-thru service consisting following, from left to right fashion, (1)under ground pull section @ 1200A, 3ph., 4w, (1)1200 main breaker section and (1) section with double-meter. with main tenant breakers (400A each) underneath, at distribution part and finaly, (1) 3-meter (blank, all 200A) section with distribution board beneath for future, sub devisions. Total : (4)sections across the existing 12-foot long brick wall.
 
Contact SQ D, Cuttler Hammer, GE, or any other gear manufacturer, they can help.

Roger
 