laketime
Senior Member
Homeowner has a new 2 story house being built. They want 200amp panel/meter for each floor (going to rent one floor out). I am doing load calcs and for the one floor I have plans for a 200a is not over the top. Would I have to have a 400amp service drop to a dual meter pack and then break it down to (2) 200amps? Can you feed (2) 200amp panels off a 200amp drop?
Last edited: