When When running a medium voltage riser up a building to the penthouse (concrete encased) where does it say in the code how much cover is required (conc.) around the duct bank? There are pull boxes installed every couple floors with vertical supports for the cables but where can I find how much encasement I need around my conduits does it get designed like a duct bank just vertically? I have seen many details for different duct banks with different requirements for the amount of concrete topping is this in relation to the depth?