I know I had precious post about the duct above panelboard however it got closed before i can post pictures
Please see below duct within structure joist. The bottom of structure joist will have ceiling attached (not shown because not their het) so that their is no suspended ceiling.
See the gap in between like doorway that going to have panelboard right under the ceiling.
Would the panelboard install be non compliant to NEC 2017 section 110.26(E)(1)(a) or does the panelboard need to be relocated?
Please see below duct within structure joist. The bottom of structure joist will have ceiling attached (not shown because not their het) so that their is no suspended ceiling.
See the gap in between like doorway that going to have panelboard right under the ceiling.
Would the panelboard install be non compliant to NEC 2017 section 110.26(E)(1)(a) or does the panelboard need to be relocated?