What are steps and formulas involved to carry out typical earthing calculations in Industrial Plant, Petrochemicals or Refinery?
In the above locations whether the steps and earthing calculations involved is applicable for substation and other equipments including the structures housing the equipments.
Are there any rules of thumb to carry out the earthing calculations?
In the above locations whether the steps and earthing calculations involved is applicable for substation and other equipments including the structures housing the equipments.
Are there any rules of thumb to carry out the earthing calculations?