What are some of the negatives would you say an EC who works under a fuel/GC would be? We as EC support the fuel GC with all the electrical work but they dont really know sequences or work flow that needs to happen before we arrive. They sometimes have us waiting to install conduit while they dig the trench same day and anther example. Currently we have a fuel station where normally you would exist the front of the store 10' towards fuel island No one bothered to check that the GC of the store stud out the conduit at the rear of the store an extra 100'. The fuel contractors labor hours is more than electrical when electrical team is there just as long. It's aggravating. Any thoughts