2005 NEC......During rough contractor put in a UFER according to plans and at the some point they decided to move the electrical room. I was under the impression that the EGC had to be continuous from the grounding electrode all the way to the service equipment. Am I mistaken, if so can some one please point out the code section.
Thanks
Thanks