Sorry if this question has been asked numerous times, but i cant find a thread dealing specifically with conduit installations. All installations I am referencing in this scenario are utilizing conduit runs. If a remote sub-panel is installed in a residence,(NOT a separate Building) where bonding is accomplished at the service panel (first point of disconnect). Is it a NEC code requirement that an equipment grounding conductor be run to the sub-panel or is the conduit a sufficient equipment grounding path. I know at the sub the neutral is isolated and the ground lug bonded. Is the conduit sufficient for clearing a fault.