robertcarbone
Member
- Location
- United States
Ran in to an existing situation I am replacing existing 75kva transformer 120/208y primary to 480volt delta secondary, feeder is run in EMT with no wire EGC they are using the EMt as the EGC which I believe you can do, it goes to a 3 phase disconnect, on the load side of disconnect going into transformer they have a 2 ft run of sealtite there is a ground wire in the sealtite going in to transformer correct out of transformer sealtite goes 4 ft to 480 volt disconnect with ground and goes to machine. My question is is the EMT still considered as a EGC on both the line & load side of transformer and do I have to go from the frame of transformer to building steel ?