joeyww12000
Senior Member
- Location
- Chatsworth GA
If Im bonding my transformer at the panel do I need to run a EGC with my phase conductors from the transformer to the panel? The transformer case is grounded by the EGC coming in with the primary feed. Would that only protect the casing from a line to case fault from the primary source since electricity is always trying to get back to its source or would that take care of a secondary line to case fault also?