Do electrical rooms require a one hour rating for walls?
Is there a definition somewhere of " Electrical Room " ?
I don't believe so, I'm not looking at my book, but I think the reference is usually something like, "area's containing electrical equipment". I agree with Jim that no walls are needed, I was simply stating that if you put up walls, the rooms going to be rated, regardless of wether it's required, if you build it right.
Yes, minimum 1 hour. Depends on construction sometimes 2-3HR. Check your prints or with GC.