Re: Electical Engineering?
I have come to the realization, multi wire or not, no EC follows my panel schedules anyway
, unless I have delineated them a certain way for redundancy.
Unless these are general lighting circuits, I don't permit multi wire branch circuits due to the unknown future of power distribution and flexibility for other distribution options for equipment or receptacle branch circuits. I realize that I walk on shaky ground here, but the clients I work with like it that way.
Roger, unfortunately I don't think about conservation too much. Most locations I design, run between 30 and the designed 100 watts/ square foot with multiple redundant distribution paths and transformers.