What type of demand factor do you use when calculating a load for a Restaurant
Just want to confirm, if I am comply everything with the NEC code
Generally the demand factor I use when I create a Panel Schedule is
Kitchen & Receptacles @ 70%
HVAC @ 100%
Hot Water Heater @ 100%
Refrigeration @ 100%
Lighting @ 125%
Just want to confirm, if I am comply everything with the NEC code
Generally the demand factor I use when I create a Panel Schedule is
Kitchen & Receptacles @ 70%
HVAC @ 100%
Hot Water Heater @ 100%
Refrigeration @ 100%
Lighting @ 125%