Frank56
Member
- Location
- Whitestone, NY
Looking for an example of an electrical load letter for Con Edison in NYC. I am upgrading the 60amp PLP meter and panel to 100 amp to accommodate the newly installed boiler. This is a 30 apt. Multi-family building. Electrical Service is more than adequate, no change in the load it has an old 60a 3-phase H-block meter and an 8 circuit fused box. Just needs to be upgraded. Thanks for any help.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk