Does the NEC have a requirement for any type of maintenance that should be performed on 480 volt panels or switchgear or specific types of circuit breakers? NFPA 70? ANSI? If so can someone please direct me to the specific code passages?
I am a Facility Manager for several Data Centers in the NY metro area and am trying to institute some best practices to assure our safe and reliable operation.
I am a Facility Manager for several Data Centers in the NY metro area and am trying to institute some best practices to assure our safe and reliable operation.