In one of our buildings we have an inverter feeding a panel which has critical equipment connected to it. This inverter has an output voltage of 220 Vac and a 4C-#2 cable is used to feed the critical panel. Inside the panel there is an array of 15A, 20A, and 30A circuit breakers. The panel rating is 120/240V, 250A max.
Does it mean that because the output of the inverters is 220Vac that the entire panel is at this voltage ? Is anyone familiar with this setup ?
Can it be a mixture of 120V/240V circuits ? Does the 4C-#2 have anything to do with this ?
Thanks in advance